Phase of SAP BA Testing
Sand box testing phase….(Upgrade only)
Note - Sandbox testing should be managed and controlled formally using project template documentation e.g. 1)) List of the Scope including static check and transaction etc 2) expected result document in hand with functional users 3) keep developing issue list- comments and resolution and any fix date etc . As we understand Sandbox testing is performed in screening mode hence less likely to be documented comprehensively such as actual test scripts, it is recommended to develop formal scripts so a knowledge base can be build for origination. An organised test activity can save lot of time for the users and functional teams who will be performing testing…
Once you basic configuration done, such as BP, Conditions, account created also the required additional business partners, we can execute basic functions in the system such as creating and changing conditions, accounts, and losses in Basic System and creating and processing in Risk Manager.
Test cases should be available that have been developed specifically for this purpose. The scope of the sandbox test environment does not include the connection to a current account system. Instead it can be used for a dummy current account system to create and relates accounts on the system interface but cannot trigger the actual processing of these – it can be exercised in dev – unit box
AFI Processes (the application side) – can be proved for stability here – running a demo test
AFI positions and postings – During sandbox position management can be calculated and a demo documentation to review postings…
AFI valuations – It is complex area to test standalone however an experience prison can develop cases for valuation and risk management to credit entities –one of the limitation is that a full portfolio can be not tested within SAP BA – we tried to define characteristics and results for test purpose of individual portfolio of instruments and calculation work for curve and broad range of effectiveness tests using key dates but because of the nature of the scenario I believe it was not best utilization of time
Application Event Management test considration for SAP Bank Analyzer, as per our experience other than applying tsting in the Development System where either no data available or activities planned purely for development not much testing can be performed for SAP BA upgrade –however full Application Event Management testing is being performed in the SAP QA during the “Realisation Phase” of the project –
Please note test team should understand the concept of SAP Bank Analyzer's function, worklist, indexes, application events and accounting events so that the Application Events teting can be applied effectively. A carefull selection of the busines processes/ functional with detail scripts can help here not only for ad-hoc daily but monthly (periodcal processes)
…
Full list of tests / business processes available in the document on demand
…